If you were injured in a scaffolding accident that was not your fault, you may be able to claim compensation. We handle scaffolding accident claims across the UK and will explain your options clearly and help you understand the next steps.

SRA

Regulated solicitors

20+

Years' experience

Here to help

No Win No Fee

Your rights

Can you make a scaffolding accident claim?

You may be able to make a scaffolding accident claim if you were injured in the last three years because of something that was not your fault. This includes workers hurt on or near scaffolding, and members of the public injured by scaffolding, falling tools, or materials.

A claim is usually made against your employer, the site’s principal contractor, or the scaffolding company responsible, through their insurer. Many are handled on a No Win No Fee basis. If you are not sure whether you can claim, our team can check for you.

Scaffold injury claims follow the same route whether the structure was a full access scaffold, a mobile tower or a single working platform, and a scaffolding injury at work does not have to involve a fall. Being struck while working below, hurt while the scaffold was being altered, or injured by boards that were not properly supported all give rise to the same duties. The three year limit comes from section 11 of the Limitation Act 1980.

Who the claim is against

Who is responsible for a scaffolding accident?

More than one party usually owes you a duty of care on a scaffolding job, and you do not have to work out which before you ring. Identifying the right defendant, or more than one, is our job. The statutory duties below are what the standard of reasonable care is measured against, and the paragraph after the cards explains how that works.

Your employer

Under section 2 of the Health and Safety at Work etc. Act 1974 an employer owes a duty to its own employees. Separately, section 1(1) of the Employers’ Liability (Compulsory Insurance) Act 1969 requires every employer carrying on a business in Great Britain to insure against liability for bodily injury sustained by its employees in the course of their employment. The claim is paid by that policy, not out of the business.

 

The principal contractor

Under regulation 13(1) of the Construction (Design and Management) Regulations 2015 the principal contractor must plan, manage and monitor the construction phase so that, so far as is reasonably practicable, the work is carried out without risks to health or safety. Regulation 13(3)(a) adds a duty to organise cooperation between contractors, which is what catches the gap between trades.

 

The scaffolding company

The firm that designed, erected, altered, inspected or dismantled the structure carries the Work at Height Regulations duties for that work, and under section 3(1) of the 1974 Act it must also conduct its undertaking so that people who are not its employees are not exposed to risk.

 

The site occupier or main employer

Section 3(1) is why the business running the site owes a standard of care to a subcontractor’s worker, an agency worker or a passer-by, whoever employed them.

 

Section 3(1) of the 1974 Act reads that it is the duty of every employer to conduct his undertaking in such a way as to ensure, so far as is reasonably practicable, that persons not in his employment who may be affected are not exposed to risks to their health or safety. That one sentence is why your employment status is usually beside the point.

How the safety rules and your claim actually fit together

This is worth being straight about. You do not sue on the safety rules themselves. Section 47(1)(a) of the 1974 Act provides that nothing in that Part confers a right of action in civil proceedings for a failure to comply with the duties in sections 2 to 7. And since 1 October 2013, section 47(2), as substituted by section 69 of the Enterprise and Regulatory Reform Act 2013, provides that breach of a duty imposed by health and safety regulations is not actionable unless regulations say it is.

What that changes is the route, not the outcome. The claim is brought in negligence, and section 47(4) preserves expressly any right of action that exists apart from the Act. The Work at Height Regulations and the 2015 Regulations then do the real work, because they set out what taking reasonable care of someone on a scaffold actually means. A missed inspection, or an unprotected gap of 600 mm where HSE guidance puts the limit at 470 mm, is powerful evidence of negligence. It is simply not a separate claim in itself, and a firm that tells you a breach is automatic liability is overselling it.

 
Why many lead to compensation

Why scaffolding accidents often lead to a claim

Employers and site managers have a legal duty to keep people safe when working at height. The Work at Height Regulations 2005 and the Construction (Design and Management) Regulations 2015 set out how scaffolding must be built, inspected, and maintained. When those duties are not met and someone is injured, the law may entitle them to compensation.

Scaffolding accidents often cause serious injuries because of the heights and weights involved. Whether you fell, were struck by falling material, or were hurt when a structure gave way, our solicitors will explain where you stand and handle the claim for you.

Four duties the Regulations impose, and what each means for a claim
  • Planning and supervision. Regulation 4(1) requires work at height to be properly planned, appropriately supervised and carried out in a manner which is so far as is reasonably practicable safe, and regulation 4(2) adds that the planning must include planning for emergencies and rescue.
  • Weather. Regulation 4(3) requires that work at height is carried out only when the weather conditions do not jeopardise the health or safety of the people involved. If you were sent up in high wind, that is the provision to look at.
  • Competence. Regulation 5 requires that nobody engages in any activity, including the organisation, planning and supervision of work at height, unless competent to do so or supervised while being trained.
  • Avoiding the risk at all. Regulation 6(2) requires that work is not carried out at height where it is reasonably practicable to do it safely some other way, and regulation 6(3) then requires suitable and sufficient measures to prevent anyone falling a distance liable to cause personal injury.

We request the operator’s inspection and maintenance records where they bear on what happened. Coach accident claims are handled the same way, including tours and private hire. 

The inspection rule

The scaffold inspection rules, and why they matter to your claim

There are in fact three separate inspection duties, and a scaffolding accident claim often turns on which of them was missed.

  • After it is put up. Regulation 12(2) provides that where the safety of work equipment depends on how it is installed or assembled, an inspection in that position has to come before any use of it.
  • Within the previous seven days. Regulation 12(4), as set out above, for a construction working platform with a potential fall of 2 metres or more.
  • After anything that could have affected it. Regulation 12(3)(b) requires inspection each time that exceptional circumstances which are liable to jeopardise the safety of the work equipment have occurred.
  • Before each use, by whoever is about to work there. Regulation 13 requires the employer, so far as is reasonably practicable, to ensure that the surface and every parapet, permanent rail or other fall protection measure of every place of work at height are checked on each occasion before the place is used.
7 days

A working platform used for construction work, from which a person could fall 2 metres or more, must not be used in any position unless it has been inspected in that position within the previous 7 days.

What the law requires

What a safe scaffold has to have

There is no height to base ratio in the Work at Height Regulations 2005 and none in the Health and Safety Executive’s scaffolds guidance. What there is instead is a set of specific requirements, and they are easier to check against a photograph than any ratio would be.

  • A top guard rail at least 950 mm above any edge from which people are liable to fall.
  • Intermediate guard rails or suitable alternatives positioned so that the unprotected gap does not exceed 470 mm.
  • A toe board sufficient to stop a fall and to stop material or objects rolling or being kicked off the edge of the platform.
  • Platforms fully boarded and wide enough for the work and for access, usually at least 600 mm.
  • Boards properly supported and not overhanging excessively, which HSE puts at no more than four times the thickness of the board.
  • A duty rating that suits the job. HSE says a scaffold should be assumed to be general purpose, with a maximum load of 2 kN per square metre, unless the provider says otherwise. An inspection and very light duty scaffold is rated at 0.75 kN per square metre and a heavy duty one at 3.0.
  • A firm, level foundation capable of carrying the scaffold and its loads, with voids such as basements or drains and patches of soft ground allowed for.
  • Ties used within their safe working load, installed as the scaffold goes up, and replaced nearby by an equivalent tie if one has to be removed to let work proceed.

The Regulations themselves back this up. Paragraph 5(b) of Schedule 3 requires a working platform to have a surface constructed so that it has no gap through which a person could fall, no gap through which any material or object could fall and injure a person, and no gap giving rise to other risk of injury, unless measures have been taken to protect people against that risk. One provision, and it covers both the worker who went through the boards and the passer-by hit by what came through them.

 
Common Causes

Common causes of scaffolding accident claims

You may be eligible to claim if your injury was caused by an employer’s, contractor’s, or scaffolding company’s negligence.

Falls from height

Missing guard rails, gaps in the boarding, unsafe access, or working without proper edge protection. A fall from scaffolding claim usually turns on whether the edge protection was there and whether the boards were sound.

Collapses and unstable structures

Poorly built, overloaded, or badly maintained scaffolding that gives way under weight or in bad weather. A scaffolding collapse claim turns on the stability requirements in Schedule 3.

Falling tools and materials

Objects dropped from height striking workers on the scaffold or people passing below.

Whatever caused your accident, if an employer or another party was at fault you may have a claim. Tell us what happened and we will let you know where you stand.

Scaffolding collapse claims

A collapse is the clearest kind of scaffolding claim, because the Regulations say in terms what a structure has to do. Paragraph 2 of Schedule 3 requires the surface the supporting structure rests on to be stable, of sufficient strength and of suitable composition to support the structure, the platform and any loading intended to be placed on it. Paragraph 3 requires the supporting structure to be suitable and of sufficient strength and rigidity, to be prevented from slipping, to be stable while being erected, used and dismantled, and when altered or modified to be so altered that it remains stable.

Whoever employed you

Self-employed, agency and subcontractor claims

Whoever was in control of the site and the work has a duty to keep people safe, whatever your employment status. Self-employed workers, agency workers, and subcontractors can all make a claim if someone else’s failure caused the accident.

The Work at Height Regulations say so directly. Regulation 3(2) applies an employer’s duties to work by an employee of his and to work by any other person under his control, to the extent of that control. Regulation 3(3) then applies the same requirements to a relevant self-employed person, and to any other person in relation to work by a person under their control. Control is the test, not the contract.

Which journeys are covered is a separate question. Article 2(1) catches regular services with a scheduled distance of 250 km or more. For a regular service shorter than that, Article 2(2) applies only a short list of other articles and Article 7 is not among them, so a local bus route is outside it. Article 2(3) catches occasional services, which is where coach tours and private hire coaches sit, so a Birmingham to London coach and a day trip are both in. If your journey was a local one, none of this reduces your claim. It simply means the claim rests on the ordinary duty of care, which is how the claims on this page are ordinarily brought in any event.

What it is worth

How much compensation for a scaffolding accident?

There is no single figure. What a scaffolding injury claim is worth depends on how serious your injury is, how long it affects you, and the financial losses that follow. Falls and impacts from height can cause serious harm, from fractures to head, back and spinal injuries.

We will never promise a set amount. Once an independent medical report sets out your injury and your recovery, your solicitor can explain what your claim may include.

The injury itself is valued against the Judicial College Guidelines, now in their 18th edition, published on 9 April 2026. That is the book the other side’s insurer works from too, which is why the medical report matters more than any figure quoted over the phone. Your financial losses are then added on top.

  • Pain, suffering and the effect on your daily life.
  • Lost earnings, now and in the future.
  • Treatment, rehabilitation and care.
  • Travel and other out-of-pocket costs.

The whiplash tariff does not apply to a scaffolding claim. Those fixed figures come from the Civil Liability Act 2018 and the Whiplash Injury Regulations 2021 and reach only a road traffic injury, so a scaffolding injury is valued in the ordinary way against the Guidelines. 

 
The numbers

How often do people fall from height at work?

The Health and Safety Executive publishes the figures and they are blunt. In 2025/26, 126 workers were killed in work-related accidents in Great Britain. Falls from a height accounted for 31 of them, more than any other kind of accident. Construction accounted for 25 worker deaths, more than any other industry.

For injuries short of death, the self-reported non-fatal injury rate in construction was 2,500 per 100,000 workers against 1,780 across all industries, an annual average over 2022/23 to 2024/25. That is the second highest rate of any sector. It is worth being precise about what that does and does not show: on work-related ill health the construction rate of 3,790 is below the all-industry average of 4,170. So the risk that stands out in construction is injury rather than illness, which is the opposite way round from several other sectors.

HSE does not publish a separate count of falls from scaffolding, or of injuries to scaffolders as an occupation, so there is no reliable figure for either and we have not invented one. Falls from a height is the category the data supports, and it is the largest single cause of workplace death in Great Britain.

 
Time limits

How long do you have to make a scaffolding accident claim?

Three years from the date of the accident in most cases, under section 11 of the Limitation Act 1980. If you were under 18 when it happened, time does not start running until your eighteenth birthday, so you have until you are 21. If the injured person lacks the capacity to conduct a claim, the three years may not have started at all. A court has a discretion under section 33 to allow a claim brought late, but it is a discretion and never something to rely on.

There is a practical deadline before the legal one. Inspection records have to be kept only until the next inspection is recorded, under regulation 12(6), and a scaffold in use has to have been inspected within the previous seven days. Site photographs, delivery notes and the names of the gang working that level all get harder to retrieve as the job finishes and the site closes. The sooner someone asks, the more there is to find.

How much compensation for a scaffolding accident?

There is no single figure. Scaffolding accident compensation depends on how serious your injury is, how long it affects you, and the financial losses that follow. Falls and impacts from height can cause serious harm, from fractures to head, back and spinal injuries.

We will never promise a set amount. Once an independent medical report sets out your injury and your recovery, your solicitor can explain what your claim may include.

A claim can include
  • Pain, suffering and the effect on your daily life
  • Lost earnings, now and in the future
  • Treatment, rehabilitation and care
  • Travel and other out-of-pocket costs
What You Need

Evidence that supports your claim

Clear evidence helps show how the accident happened and how it has affected you. You do not need to gather everything before you get in touch. We can help.

Accident and site records
The accident book entry, any report to the HSE, and the site's risk assessments or scaffold inspection records.
Photographs of the scaffold
Photos of the scaffolding, the scene, and anything that caused the accident, such as a missing guard rail.
Medical records
GP or hospital notes and any scans. In most claims, a medical report is arranged through an independent expert.
Witnesses and losses
Details for anyone who saw what happened, plus payslips and receipts for money you have lost or spent.

Report it and get checked. Reporting the accident to your employer or site manager, and getting your injury seen by a doctor, creates a clear record of how and when it happened.

Office desk with a laptop, clipboard, pen, document folders, magnifying glass, and stationery arranged in a tidy workspace.
1
We assess your claim and advise on your options and prospects.
2
We gather the evidence, including site records and scaffold inspection reports, and arrange the medical report.
3
We deal with the employer, contractor, or scaffolding company and their insurer on your behalf.
4
We work towards a fair settlement and keep you updated at each stage.
Risk Free

No Win No Fee scaffolding accident claims

You can start a scaffolding accident claim without paying anything upfront. If your claim is unsuccessful, you will not pay a fee for our work, subject to the terms of your agreement.

If your claim succeeds, an agreed success fee is deducted from your compensation. Your solicitor will explain this clearly before you commit to anything.

You will see the full terms in writing before your claim begins.

Got Questions?

Frequently Asked Questions

Everything you need to know before starting your claim.

Who is responsible for a scaffolding accident?

It depends on what went wrong. Responsibility can lie with your employer, the site’s principal contractor, or the scaffolding company that built or inspected the structure. More than one party can share the blame. You are claiming against their insurer, and we will identify the right party for you.

It depends on how serious your injury is, how long it affects you, and the financial losses that follow, such as lost earnings and treatment costs. Falls from height often cause serious injuries, so there is no reliable average. Our team can give you a clearer idea once a medical report is in place.

A claim is made against your employer’s insurance, not their own pocket, and you have legal protection against being treated unfairly for making a genuine claim. Blacklisting workers for raising safety concerns or claiming is unlawful. Our team will explain how it works before you decide anything.

You may still be able to claim. Where responsibility is shared, this is known as contributory negligence, and compensation is usually adjusted to reflect each side’s share of the blame. If unsafe conditions caused the accident, it is still worth getting advice.

The most common are falls from height, usually from missing guard rails or gaps in the boarding, collapses of poorly built or overloaded scaffolding, and injuries from tools or materials dropped from above. Each can support a claim if the scaffold was not safe.

Often, yes. Whoever was in control of the site and the work has a duty to keep people safe, whatever your employment status. Self-employed workers, agency workers, and subcontractors can all make a claim if someone else’s failure caused the accident.

Can't Talk Right Now?

Check if you can make a scaffolding accident claim

Tell us what happened and we will review your details and get back to you. We will explain your options in plain English, with no obligation to go ahead.

Check if you can make a claim

Takes less than 60 seconds

    We'll review your details and contact you within 24 hours
    TAKE ACTION TODAY

    Don't Let Time Run Out On Your Claim

    Most scaffolding accident claims must be started within three years. The sooner you begin, the easier it is to gather site records, scaffold inspection reports, and other evidence while everything is still available.

    Learn More

    Related Blogs

    Spectator Injuries at Sporting Events with stadium staff assisting an injured football fan after an accident

    Spectator Injuries at Sporting Events: Can You Claim?

    School injury claims consultation between a parent and solicitor overlooking an empty UK school playground.

    School Injury Claims: Compensation for a Child Injured at School

    Military hearing loss claims for veterans and service personnel

    Military Hearing Loss Claims: Why 15 May 1987 Decides Your Route

    Scroll to Top